Winter Projects While You’re Away
The house sits empty from October to May. That's the best time to fix it.
- Licensed & bonded
- WA L&I #SANJUJI741OT
- Insured
- Locally owned in Friday Harbor
Most island owners have the same problem with their repair list: the only time they're here to deal with it is the only time they want to be enjoying the place. Nobody wants to spend a July week living around drop cloths, sawdust, and a guy on a ladder. So the list grows every summer and nothing on it gets done.
Winter flips that. From October through April a lot of houses on this island are empty, the furniture can move without anyone tripping over it, paint can cure for days without a family breathing it, and I can work a project straight through instead of fitting it between guest stays. You leave in the fall with a list. You come back in spring and it's done.
The work that fits best is inside work, because the weather doesn't decide the schedule: interior painting, drywall, trim and doors, floor repairs, cabinets, shelving and storage, and the long tail of small fixes on a punch list. Outside work like rot repair and deck repair happens in the dry stretches, and there are more of those in a San Juan winter than people expect.
How it works: we walk the house in September or October, in person or over a video call. I write up the list with a price or an hourly estimate for each item, and you pick what you want done. I order materials early, because a lot of what an island house needs isn't stocked on-island and it's easier to wait on a shipment in November than in June.
While the work is going you get photos at each stage, not just at the end. If I open a wall and find something that changes the job, you get a call and options before I go further. Nothing gets added to the bill without your say-so.
If you already have property care with me, winter projects fit around your monthly visits and you get the plan discount on the hourly work. If you don't, this is a good way to find out how I work before you sign up for anything ongoing.

What’s included
- Fall walkthrough and a written project list with costs
- Materials ordered early so the work isn't waiting on shipping
- Interior painting, drywall, trim, doors, floors, cabinets, shelving
- Exterior rot and deck repair in dry weather windows
- Photo updates at each stage of every project
- A call before any change to scope or cost
- House cleaned up and closed back up when each job is finished
What it costs
Projects are quoted up front where the scope is clear, and billed hourly where it isn't. Hourly work is $250 minimum visit, which covers up to two hours, then $85/hour in quarter-hour increments. Washington sales tax applies to the total. Full rate card.
Book in September or October for the best spot on the winter calendar. By January the good dry-weather windows for outside work are spoken for.
Full rate cardCommon questions
Do I have to be here?
No. That's the whole point. We do the walkthrough in the fall, and after that it's photos, texts, and a call if anything needs a decision.
What if you find something bigger once you start?
You get a call with photos and options before I keep going. I don't expand a job without approval.
Can you do exterior painting in winter?
Usually not. Paint needs dry wood and temperatures that hold overnight, and that's spring through early fall here. Winter is for inside painting and outside carpentry. Exterior painting goes on the calendar for spring.
Next step
Want this off your list?
Call (360) 317-0203 or send the details and I’ll tell you what it takes.
Related